Confined space entry and trenching deeper than 1.5 m are high risk construction work, so they need a site-specific Safe Work Method Statement before the job starts. Hot work and chemicals need their own controls, and the SWMS covers them when the job includes high risk construction work. Tradietool will draft one from your voice description of the actual task, ready for you to review and approve.
Coming soon — Tradietool generates electrical SWMS first.
A Safe Work Method Statement (SWMS) is a mandatory safety document for any plumbing work that involves High Risk Construction Work (HRCW) activities. Under the Work Health and Safety Regulation in Queensland and NSW, a SWMS must identify the HRCW activities in the task, describe the associated hazards and specify the controls that will be used to manage those hazards before work begins.
For plumbers, the most common HRCW triggers are Category 6 (confined space entry) and Category 7 (work in or near a trench or shaft over 1.5 m deep, or a tunnel). Both need a SWMS before the work starts, and confined space work has its own extra rules as well, including emergency and rescue arrangements.
Hot work (brazing, soldering, oxy-acetylene cutting) often needs a permit from the principal contractor, and the SWMS should cover fire prevention and a fire watch. Chemicals such as PVC solvent cement and drain cleaners need their safety data sheets on hand and the right PPE.
A generic plumbing SWMS template on its own won't fit the job. Each job needs its own document that reflects the actual site conditions, the specific confined space configuration, the soil classification for excavation work, and the atmospheric conditions on that day. Tradietool will draft this from your voice description of the task.
Where they apply to the job, your plumbing SWMS should name each of these hazards and say how it is controlled.
Sewer manholes, water tanks and stormwater pits can all be confined spaces. Controls include testing the air (O₂, CO, H₂S, flammable gas), mechanical ventilation, a standby person and rescue equipment. HRCW Category 6.
Brazing copper, oxy-acetylene cutting and soldering near things that can burn. A fire watch, an extinguisher close by, moving or protecting combustibles, and checking the area after the work is done.
A trench deeper than 1.5 m is HRCW Category 7. Controls include shoring, benching or battering before anyone goes in, and finding underground services before you dig.
PVC cement, flux, pipe-joining compounds and drain-clearing chemicals can be breathed in or burn the skin. Check the safety data sheets, keep the area ventilated and wear the right chemical-resistant PPE.
When plumbing is live, you speak the job and Tradietool identifies the plumbing HRCW categories, drafts controls under the Queensland and NSW WHS rules, and produces a PDF for PCBU review.
Work in or near a confined space is high risk construction work under regulation 291 of the WHS Regulation, so a SWMS has to be prepared before it starts (regulation 299). Think sewer manholes, stormwater pits, water tanks and under-slab voids. The SWMS should cover how the air is tested, ventilation, the standby person, the rescue plan and how the crew stay in contact. Confined spaces have their own extra rules too, so check them before anyone goes in.
Hot work on its own isn't one of the kinds of high risk construction work in regulation 291, but it often comes with one: work near pressurised gas mains or piping, near chemical, fuel or refrigerant lines, or where the air may be flammable. When it does, the SWMS covers the hot work too: a fire watch, extinguishers on hand, moving or protecting anything that can burn, and the right PPE. Many principal contractors also ask for a hot work permit.
Work in or near a shaft or trench deeper than 1.5 metres, or a tunnel, is high risk construction work under regulation 291, so it needs a SWMS before it starts. The SWMS should cover how the trench is supported (shoring, benching or battering), how people get in and out, finding underground services before you dig, and what happens if the ground changes.
Tradietool generates electrical SWMS first. When plumbing is ready, you will speak the job for 30 seconds and review a draft SWMS before your crew starts.